Commissioning & Completions - Delivery Support

Commissioning that's systemised, governed, and ready for handover.

IIMB Consulting helps operators with complex commissioning scopes close the gap without hiring a permanent Commissioning department. Fifteen years building the systems that prove readiness — on manual and CCMS-based platforms alike.

Email: IIMBConsult@gmail.com Forest Glen, QLD Initial consult free
15 yrsCommissioning & completions delivery
6Core service pillars
2011–2026Manual to CCMS-based systems, both ways
The problem

Commissioning is treated as a phase. It should be treated as a discipline.

Bolted on late

Commissioning often gets planned after design and construction decisions are already locked in.

Gaps without cover

Few Operators have the appetite to build and maintain a permanent Commissioning team embedded in the organisation.

Handover under pressure

Without early structure and front end planning, teams scramble at the end to prove readiness against schedule.

What I do

A systems-based approach to commissioning and completions.

01

Systemisation & Gate Governance

Structure defined early — evidence-based gate decisions, not calendar-driven ones.

02

CCMS & Completions Assurance

ITP mapping, certification sufficiency, and completions structures that hold up under audit.

03

Procedures & Plans

Commissioning Plans, Execution Plans, and test procedures authored or audited to a reliable standard.

04

Reporting & Visibility

Dashboard design for Live view of design document backlog & revision status, punch items, schedule health, completion status, gate readiness or any other critical project data stored in digital format. No need to get multiple reports in different formats from multiple departments to see the health of the project

05

Readiness & Interfaces

Interface handoffs tracked, operational readiness confirmed before start-up.

06

Mentoring & Capability Build

Transferring skills to new Commissioning Managers and coordinators — a bridge, not a replacement.

Credibility

Not theory. Delivered, tested, and lived on the ground.

Built both manual and CCMS-based completions systems since 2011. Led teams through testing and start-up under systems built well — and rebuilt confidence under systems that weren't.

Reporting & analytics

Also available: operational reporting that makes performance easier to see.

For clients who need visibility beyond commissioning — Power BI dashboards for operational performance, project controls, and completions tracking.

Operations performance Executive view
94%On-time completion
18Open exceptions
$82kMargin at risk
Project controls Plan vs actual
126Jobs delivered
+7%Productivity variance
3Contracts off track
How we engage

A defined, scoped way to close the gap — without a permanent hire.

01

Diagnostic

Fixed scope, fixed fee, clear findings.

02

Scoped Support

Fixed term, fixed rate, reviewed monthly.

03

Capability Handover

Yours to run, ours to have built.

Not a recruitment process. Not an open-ended retainer.

Get in touch

You already know where the gaps are. Let's build the structure that closes them.