Bolted on late
Commissioning often gets planned after design and construction decisions are already locked in.
IIMB Consulting helps operators with complex or “in-distress” project scopes by closing the gap between Construction completion and Project Handover. With early engagement and ‘starting with the end in mind’ we can streamline your project governance to ensure the end of your project is not a scramble.
Commissioning often gets planned after design and construction decisions are already locked in.
Few Operators have the appetite to build and maintain a permanent Commissioning team embedded in the organisation.
Without early structure and front end planning, teams scramble at the end to prove readiness against schedule.
Structure defined early — evidence-based gate decisions, not calendar-driven ones.
ITP mapping, certification sufficiency, and completions structures that hold up under audit.
Commissioning Plans, Execution Plans, and test procedures authored or audited to a reliable standard.
Dashboard design for Live view of design document backlog & revision status, punch items, schedule health, completion status, gate readiness or any other critical project data stored in digital format. No need to get multiple reports in different formats from multiple departments to see the health of the project
Ensure that the schedule aligns with the Commissioning and Handover sequence, setup the key vendor and Owner interface points and align expectations before anything is energised.
Reviewing the Operational Readiness structure and ensuring that all required project handover elements are developed progressively and not just at the end.
Engage during FEED to shape scope, schedule, and risk strategy, guiding decision gates to set the foundation for successful execution.
Custom procedures and integrated system commissioning protocols developed, ensuring testing and start-up are aligned with project specifics from day one.
By participating in design reviews and operability studies, commissioning ensures systems are designed for reliable operation, maintainability, and future asset resilience.
Build and configure the completions management system (CCMS), mapping systemisation and handover requirements to enable seamless tracking and documentation.
Commissioning reviews regulatory requirements and lessons-learned repositories to identify risks early, integrating mitigation actions into planning.
Creating dynamic links between the commissioning process and document registers, ensuring a “single source of truth” with auditable records and ready access for all stakeholders.
Coordinating and planning off-site Factory Acceptance Tests and contract interface workflows ensures equipment arrives “commissioning ready” and documentation is complete.
Identifying and scheduling training, developing operational readiness checklists, and feeding early learnings into the project delivery schedule for workforce preparedness.
Provide real-time input and dynamic project dashboard reporting (see below) for measurable transparency and progress, supporting schedule integration and resource planning.
By acting as the central conduit between design, construction, vendors, and owners, ensure outcomes are embedded across all phases, preventing late-stage misalignment and costly rework.
For clients who need visibility beyond commissioning — Power BI dashboards for operational performance, project controls, completions tracking, punch list items, drawing revisions and Red-lines, and milestones.
Fixed scope, fixed fee, clear findings.
Fixed term, fixed rate, reviewed monthly.
Yours to run, ours to have built.
Not a recruitment process. Not an open-ended retainer.